Figure 7. Plots in equal-area projection and geographic North Pole orthographic projection at 20 days of ocean or land surface height, whichever is greater, (a), (b); cumulative depth of bedrock erosion, (c), (d); and cumulative depth of deposited sediment, (e), (f). In (a) and (b) arrows denote water column velocities, clipped at 200 m/s. In (c)-(f) arrows denote water velocities just above the land surface, clipped at 30 m/s. BAUMGARDNER AND NAVARRO Large tsunamis and Flood sediment record 2023 ICC 375
RkJQdWJsaXNoZXIy MTM4ODY=