Science and Engineering Expansion Campaign Brochure - page 6

PHASE 2C
MAY 2015
ENS SECOND FLOOR INSTALLATION
OF BIOLOGY LABS
• Classroom space for principals of Biology,
Molecular and Cellular Biology, Microbiology,
Biology Research/Teaching Lab, and
Immunology
• Faculty and student research labs and
instruments installed
PHASE 2D
SEPTEMBER 2015
ENS FIRST FLOOR CONVERSION
TO ENGINEERING LABS
• 2,550 sq. ft. of lab space
• Biomedical Project Lab
• Mechanical Engineering Vibrations Lab
• Mechanical Engineering Senior Design
Computational Lab
• Electrical Engineering and Computer Science
Senior Design Lab
PHASE 1
MAY 3–AUGUST 1, 2014
ENS THIRD FLOOR ROOM 350 REMODEL
AND CLASSROOM UPGRADES
• Gross Anatomy Lab – secure, state-of-the-art
space with dedicated purpose
• Human Structure and Function Lab – upgraded,
dedicated space
• Anatomy and Physiology Lab – upgraded,
dedicated space
• Two offices on third floor for human biology
faculty
• Upgraded technology and general renovation
of lecture hall (room 245)
• Dedicated mathematics classroom
• Student Collaboration Room
6 | Providing the Solution
KEY
RENOVATION OF EXISTING FACILTY
OPPORTUNITY FOR FUTURE EXPANSION
EXISTING ENGINEERING FACILITY
ENGINEERING AND
SCIENCE CENTER
APPLE TECHNOLOGY
RESOURCE CENTER
FUTURE ENGINEERING
PROJECTS LAB SPACE
MAIN STREET (RT. 72)
1,2,3,4,5 7,8,9,10,11,12
Powered by FlippingBook